http://s1134.photobucket.com/albums/...0cpilot/Dazon/ These are the before we took the Dazon apart. You can see that there is a piece of steel between the gearbox and the portion of the engine case where the clutch mounts.
Thedonor sled pictures.
http://s1134.photobucket.com/albums/...00cpilot/Sled/
As you can tell I have not even unloaded the sled yet.
As far as the mounting a pully to the gear box, well I have not got a clue yet. I am sure some things are going to need to be built.
Edit:
ok if I extend the frame by 8 inches, use the primary and secondary clutch from the sled and then use the shaft with a chain/gear to the gearbox?