well now that the christmas rush is over i can start to get some shop work done. resumed work on the yerf this weekend, got the steering shaft lengthened made a new luggage rack and got the basic outline of the cage done. the owner wanted 2 tanks so i figured i'd re design the luggage rack to incorporate a saddle bag system. use some cut up carter talon sections i had laying around for the tank mounts
__________________
"LUCIFER" JOYNER JD400,
CROSSHAMMER 250R,
YERF GX150,
CROSSFIRE MBX150,
BMS 800V-TWIN
'16 RZR 900s ,
'17 ACE 900XC,
'99KX250,
'94 KDX200,
'18 SSR SR170TX
|