View Single Post
  #4  
Old 07-29-2010, 09:52 AM
Kartjet52 Kartjet52 is offline
Lite Contributor
 

Join Date: Jul 2010
Location: Conway SC
Posts: 59
Default

Got all the slugs and tubes cut to size. I plan on drilling holes in the frame to plug weld the slugs along with welding at the seams.

Slug's to be used.


Held together with ratchet straps. Sat in it, I think 10" will be perfect. Obviously the steering wheel is to far from the seat. That will be adjusted once the frame work is done.


Full mock up....Keep in mind nothing welded yet just strapped together.


Next will be plug welding the slugs.... all 14 of them.

Last edited by Kartjet52; 02-10-2013 at 08:06 AM.
Reply With Quote