View Single Post
  #14  
Old 08-07-2010, 06:39 AM
chuckorlando chuckorlando is offline
Contributor
 

Join Date: Apr 2010
Posts: 356
Default

The stock down bar right next to the seat and the one that runs from the pan around for the stearing... Notch a tube to go from the lower corner on both and up to the center of the upper bar. That way as the frame flex's down in the center it will transfer the pressure down and into the cage. Then if you got the steel run from the center ,or close to it, of the top bar and run one up to the windsheild area.
Reply With Quote