View Single Post
  #12  
Old 10-08-2014, 07:50 PM
x-bird's Avatar
x-bird x-bird is offline
Power User
 

Join Date: Oct 2011
Location: Penciltucky
Posts: 2,518
Default

Got a little over 2 full days into it now hours-wise. Rear framework is ready to weld up. the back frame extension will have a piece of angle iron over the rear most tube to mount the heim tabs for the subframe connection and to close off the end of the side tube.

Cut off everything but the reverse lever mount, utility rack tabs and the steering column mount hoop --which may get moved anyway along with the main bar its on. A bit of misc. tight spot paint removal to do.

Started in on blending the quad front end into the picture today, that's working out fairly well. first side is tedious as i'm slowly grinding away at about 5 different points to fit it in correctly. Side 2 will be a lot quicker as i'll know how much excess to take off right at the start.
Attached Images
File Type: jpg DSC_0013.jpg (96.3 KB, 28 views)
File Type: jpg DSC_0023.jpg (92.7 KB, 26 views)
File Type: jpg DSC_0022.jpg (93.5 KB, 32 views)
Reply With Quote