View Single Post
  #24  
Old 10-16-2013, 07:43 PM
toomanytoys2's Avatar
toomanytoys2 toomanytoys2 is offline
Contributor
 

Join Date: Sep 2012
Location: Lefty California
Posts: 284
Default

Got a little time today to get some work done today between my morning classes and my night class. Normally I go in for acupuncture for my back in between classes, but the doc had to reschedule. So that left me a good four hour window to play. I went ahead and made the main supports that the mid shaft pillow blocks will bolt to. Luckily, I had the right size of square tubing in my scrap pile. Right now the supports are just sitting in a general position. After a little more measuring, I will find their correct locations then tack them into place. One thing though, I am definitely going to look into a tubing notcher. I am tired of fish mouthing tubing with a grinder.

On a side note, I was digging through one of my sheds yesterday and found that I already have the 944 CVs. They are used, and I believe that they were showing too much wear for me to put in my Baja. However, they are good enough to at least get me running in my build.
Attached Images
File Type: jpg mid axle 3.jpg (97.7 KB, 34 views)
File Type: jpg Mid axle 4.jpg (98.1 KB, 31 views)
__________________
2005 Hammerhead 150
170cc BBK, PnP Big valve Head, A12 Cam, Uni Filter, Custom Exhaust, 10G rollers, 1500 Contra Spring, 2000 Clutch Springs

Just added - 2007 Joyner 250 SV - Let the fun begin

4-Dirt Bikes, Baja Bug and enough toys to keep me in the garage and out of trouble.
Reply With Quote