View Single Post
  #16  
Old 09-27-2017, 09:34 PM
Pripyat Pripyat is offline
Contributor
 

Join Date: Aug 2017
Posts: 143
Default

Thanks for the input, everyone. I've got some 1/8x1.5" steel on order for the bulkhead. Those pictures of the 5 point install were also very helpful. I was over-thinking and had plans to weld tabs for most of the attachment points. I now see that is unnecessary.

Work is going to prevent me from tinkering with the kart for the next week or so. Updates soon, though..
Reply With Quote