Got a little time today to get some work done today between my morning classes and my night class. Normally I go in for acupuncture for my back in between classes, but the doc had to reschedule. So that left me a good four hour window to play. I went ahead and made the main supports that the mid shaft pillow blocks will bolt to. Luckily, I had the right size of square tubing in my scrap pile. Right now the supports are just sitting in a general position. After a little more measuring, I will find their correct locations then tack them into place. One thing though, I am definitely going to look into a tubing notcher. I am tired of fish mouthing tubing with a grinder.
On a side note, I was digging through one of my sheds yesterday and found that I already have the 944 CVs. They are used, and I believe that they were showing too much wear for me to put in my Baja. However, they are good enough to at least get me running in my build.
__________________
2005 Hammerhead 150
170cc BBK, PnP Big valve Head, A12 Cam, Uni Filter, Custom Exhaust, 10G rollers, 1500 Contra Spring, 2000 Clutch Springs
Just added - 2007 Joyner 250 SV - Let the fun begin
4-Dirt Bikes, Baja Bug and enough toys to keep me in the garage and out of trouble.
|