View Single Post
  #176  
Old 12-19-2016, 08:30 AM
jmansracerocket's Avatar
jmansracerocket jmansracerocket is offline
Senior Member
 

Join Date: Apr 2012
Location: ny, long island
Posts: 1,342
Default

ive been slacking a little here with the project. So some update, the main cage is done and welded in. Seat has been fitted, and mounted. Next step is to get the positioning and length of the pedals set and welded in. Most likely going to move the main front tube back 1.5 inches. hoping to get to some of it this week.





__________________
Hammer head Single seater know as herbie
under construction

Aluminum fuel tank, aluminum wheels, custom fuel/cargo rack, entire rewire, trail tech vapor, ported big valve head, a12camshaft, 12 gram sliders, straight intake, kirkey wide seat, front end extension. 4 point harness, welded cage. Hammerhead exhaust.



Blade Single Seater Restore
welded cage, engine build, new wiring harness/electric box, spun aluminum fuel tank.

Last edited by jmansracerocket; 12-19-2016 at 09:39 AM.
Reply With Quote