View Single Post
  #25  
Old 02-20-2012, 07:14 PM
Rarerat's Avatar
Rarerat Rarerat is offline
Contributor
 

Join Date: Dec 2009
Location: New Mexico
Posts: 456
Default

I got in a couple of hours on the new Ody project today. My POS tubing bender took a dump so My rear section plans have changed for now. I have the left side partially welded back on, it still needs to be braced and triangulated but here is a quick peek with half the cage on it.



As of now I only have the bottom of the right side welded on. I need to remove the roll bar mount on the right side frame rail so I can extend the frame and then move it out. i decided on stretching the frame 3 inches, i figure I can manipulate the cables to gain the extra 3 inches so I don't have to worry about cable issues.

If I get a chance tomorrow, I will try and get the right side done and the other half of the cage mocked up.
Reply With Quote